Citation:
Citation_Information:
Originator: Robert C Hilldale
Publication_Date: 2018
Title:
Monthly bedload estimates, Elwha River, Washington, October 2015 to September 2016
Geospatial_Data_Presentation_Form: comma-delimited text
Series_Information:
Series_Name: data release
Issue_Identification: DOI:10.5066/F7PG1QWC
Publication_Information:
Publication_Place:
Pacific Coastal and Marine Science Center, Santa Cruz, California
Publisher: U.S. Geological Survey
Online_Linkage: https://doi.org/10.5066/F7PG1QWC
Online_Linkage:
Larger_Work_Citation:
Citation_Information:
Originator: Andrew C Ritchie
Originator: Christopher A Curran
Originator: Christopher S Magirl
Originator: Jennifer A Bountry
Originator: Robert C Hilldale
Originator: Timothy J Randle
Originator: Jefferey J Duda
Publication_Date: 2018
Title:
Data in support of 5-year sediment budget and morphodynamic analysis of Elwha River following dam removals
Series_Information:
Series_Name: data release
Issue_Identification: DOI:10.5066/F7PG1QWC
Publication_Information:
Publication_Place: Pacific Coastal and Marine Science Center, Santa Cruz, CA
Publisher: U.S. Geological Survey
Online_Linkage: https://doi.org/10.5066/F7PG1QWC
Description:
Abstract:
Bedload sediment transport was calculated on the Elwha River, Washington to measure the amount of sediment transported along the riverbed during the 2016 water year. Bedload was measured using the Elwha bedload impact plate system (Hilldale and others, 2015). Physical bedload sampling by the U.S. Bureau of Reclamation for system calibration took place during November, 2012; March, May, and June 2013; and April 2014 at the Diversion Weir gauge (Magirl and others, 2015). Early in water year 2016 (year 5) the river formed an avulsion channel across the floodplain on river left, preventing a complete measurement of bedload passing the Diversion Weir gauge. As a result, bedload for water year 2016 (year 5 of the larger study) was estimated using a discharge rating curve to obtain monthly values.
Purpose:
Data were obtained to assess the morphodynamic and sediment budget responses following the removal of two dams in the Elwha River. These data are intended for science researchers, students, policy makers, and the general public. These data can be used with geographic information systems or other software to identify topographic features.
Time_Period_of_Content:
Time_Period_Information:
Range_of_Dates/Times:
Beginning_Date: 201510
Ending_Date: 201609
Currentness_Reference: ground condition
Status:
Progress: Complete
Maintenance_and_Update_Frequency: As needed
Spatial_Domain:
Bounding_Coordinates:
West_Bounding_Coordinate: -123.601338
East_Bounding_Coordinate: -123.548927
North_Bounding_Coordinate: 48.151755
South_Bounding_Coordinate: 48.001990
Keywords:
Theme:
Theme_Keyword_Thesaurus: USGS Metadata Identifier
Theme_Keyword: USGS:5a205e6de4b09fc93ddbaeb1
Theme:
Theme_Keyword_Thesaurus: ISO 19115 Topic Category
Theme_Keyword: inlandWaters
Theme:
Theme_Keyword_Thesaurus: Data Categories for Marine Planning
Theme_Keyword: Substrate
Theme:
Theme_Keyword_Thesaurus: USGS Thesaurus
Theme_Keyword: field inventory and monitoring
Theme_Keyword: time series datasets
Theme_Keyword: river systems
Theme_Keyword: river reaches
Theme_Keyword: sedimentology
Theme_Keyword: sediment transport
Theme_Keyword: sedimentation
Theme_Keyword: suspended material (water)
Theme:
Theme_Keyword_Thesaurus: Marine Realms Information Bank (MRIB) keywords
Theme_Keyword: river channel
Theme_Keyword: river bank
Theme_Keyword: sediment deposition
Theme:
Theme_Keyword_Thesaurus: None
Theme_Keyword: U.S. Geological Survey
Theme_Keyword: USGS
Theme_Keyword: Coastal and Marine Geology Program
Theme_Keyword: CMGP
Theme_Keyword: Pacific Coastal and Marine Science Center
Theme_Keyword: PCMSC
Theme_Keyword: U.S. Bureau of Reclamation
Theme_Keyword: USBR
Place:
Place_Keyword_Thesaurus: Geographic Names Information System (GNIS)
Place_Keyword: Elwha River
Place_Keyword: State of Washington
Place_Keyword: Lake Mills (historical)
Place_Keyword: Lake Aldwell (historical)
Place_Keyword: Elwha Dam (historical)
Place_Keyword: Glines Canyon Dam (historical)
Access_Constraints: None.
Use_Constraints:
USGS-authored or produced data and information are in the public domain from the U.S. Government and are freely redistributable with proper metadata and source attribution. Please recognize and acknowledge the U.S. Geological Survey and the U.S. Bureau of Reclamation as the originator(s) of the dataset and in products derived from these data.
Point_of_Contact:
Contact_Information:
Contact_Person_Primary:
Contact_Person: Robert C Hilldale
Contact_Organization:
U.S. Bureau of Reclamation, Technical Service Center, Sedimentation and River Hydraulics
Contact_Address:
Address_Type: mailing and physical
Address: 6th and Kipling, Building 67
City: Denver
State_or_Province: CO
Postal_Code: 80225
Country: United States of America
Contact_Voice_Telephone: 303-445-3135
Contact_Electronic_Mail_Address: rhilldale@usbr.gov
Data_Set_Credit: Data collection was funded by the U.S. Bureau of Reclamation
Cross_Reference:
Citation_Information:
Originator: Robert C. Hilldale
Originator: Wayne O. Carpenter
Originator: Bradley Goodwiller
Originator: James P. Chambers
Originator: Timothy J. Randle
Publication_Date: 2015
Title:
Installation of Impact Plates to Continuously Measure Bed Load: Elwha River, Washington, USA.
Publication_Information:
Publication_Place: online
Publisher: Journal of Hydraulic Engineering, 141(3)
Online_Linkage: https://doi.org/10.1061/(ASCE)HY.1943-7900.0000975
Cross_Reference:
Citation_Information:
Originator: Christopher S. Magirl
Originator: Robert C. Hilldale
Originator: Christopher A. Curran
Originator: Jeffrey J. Duda
Originator: Timothy D. Straub
Originator: Marian Domanski
Originator: James R. Foreman
Publication_Date: 2015
Title:
Large-scale dam removal on the Elwha River, Washington, USA: Fluvial sediment load
Publication_Information:
Online_Linkage: https://doi.org/10.1016/j.geomorph.2014.12.032