Replace instruments on moorings GBK2 and GBK3 and inspect mooring hardware.
Location
Georges Bank, United States, North America, North Atlantic,
Summary
Replaced VACM (102) on GBK2; 1/2 in. chain showed no wear since deployment in September from USCGC HORNBEAM. Attempted to recover mooring GBK3 at the same site, but high swells strained hauling equipment so recovery attempt was aborted. Mooring was redeployed at its original position (40d51minN, 67d25minW).