To deploy an instrumented tripod, a subsurface mooring, and a near surface current meter from the Coast Guard's large navigation buoy at the approach to Boston Harbor. In addition, sediment samples will be collected with a Van Veen grab sampler at two locations near the proposed offshore outfall for Boston's sewage treatment plant. Objective is to begin long-term monitoring of currents, sediment transport, and physical/chemical characteristics of sediments in western Massachusetts Bay.
Location
Massachusetts Bay, Massachusetts, United States, North America, North Atlantic,
Summary
Grab samples: 8-10; Moorings deployed: 2 (#338 and 339 recovered FA 90002 WHITE HEATH Mar. 27-29, 1990).
Info derived
Time series data; Samples and chemical analysis;
Comments
Major data recovery will occur when moorings are turned around in about 5 months. Information derived from pre-cruise report; no post cruise report found. Original Center People field contained: Mike Bothner, Brad Butman, Richard Rendigs, William Strahle, Adam Brown; alternate: Ginger Fry.