Take validation samples at OCS V2 site and replace PAR wiper and pump inflow head.
Location
Tampa Bay, FL
Summary
All info to be derived was complete. Three hours of discrete data was collected.
Info derived
Water samples are going to be collected and analyzed back at the lab.
Comments
One sample set collected, trawl resistant casing was dislodged. Temperature cell was collected for pH and equilibrated to ambient temperature to better control baseline. ECO-PAR was damaged from casing movement.