Field Activity 2024-314-FA

Identifier 2024-314-FA
Alternate names Aquifer Storage and Revocery (ASR) Research
Purpose Quantify the rates of bioclogging, nutrient removal and microbial pathogen inactivation associated with the constituents in the surface water recharged into different aquifer zones as part of the aquifer storage and recovery (ASR) technology as part of the Comprehensive Everglades Restoration Plan.
Location Within a 50 mile radius of the Kissimmee River ASR facility
Summary This is an ongoing project and a summary of the project is not appropriate at this time.
Info derived Rates of bioclogging associated with different surface water sources and aquifer storage zones, reductions in the concentrations of nutrients and inactivation of microbial pathogen in the surface water recharged into the aquifers.
Comments As this project is ongoing and field trips are determined by activities at the research sites that are not under the control of the USGS, all vehicle reservations are requested at least a day ahead of required use. Aquifer storage and recovery research.
Projects
Platform
on foot
survey conducted on foot
Vehicles
Chevy Suburban Silver
Ford Explorer Blue
Itinerary
Start (port not specified) 2024-05-16
End (port not specified) 2025-01-31
Days in the field Depends on research progress
Activity events
Start date End date Description
2024-05-16 2024-05-16 Site visit to collect the C38S/APP biofilm (+) column & collect native groundwater for lab experiments
2024-05-16 2024-05-16 Day trip to Okeechobee research sites to collect water for ongoing project. John Lisle is only employee traveling.
2024-05-16 2024-05-16 Trip to Okeechobee area to collect surface and groundwater samples for DNA extraction
2024-05-17 2024-05-17 Trip to Okeechobee research sites to collect native groundwater and retrieve a BDOC biofilm reactor from the APPZ mesocosm. John Lisle is the only person involved.
2024-05-31 2024-05-31 Trip to Okeechobee research sites to set up and place a biofilm development reactor in the above ground mesocosm. The project PI, John Lisle, is the only person involved on this trip.
2024-07-17 2024-07-17 Site visit to collect Kissimmee River water for C38S/APPZ column recharge phase of bioclogging project.
2024-09-11 2024-09-11 Trip to Lake Okeechobee research area to collect L63S/UFA and L63S/APPZ biofilm columns for SFWMD bioclogging project
2024-10-01 2024-10-01 Trip to SFWMD research sites in the Okeechobee area to collect groundwater samples for L63S experiments
2024-10-02 2024-10-02 Day trip to Okeechobee area research sites to insert C59 core columns into the UFA and APPZ mesocosms. John Lisle is the only employee traveling.
2024-10-30 2024-10-30 Trip to Okeechobee area to collect surface and groundwater samples for DNA extraction
2024-11-15 2024-11-15 Trip to Okeechobee research mesocosms to collect biofilm columns for SFWMD project
2024-11-20 2024-11-20 Trip to Okeechobee research sites to collection native groundwater for bioclogging project experiments
2024-12-03 2024-12-03 Trip to Okeechobee research sites to collect river water for column recharge phase of experiments
2025-01-15 2025-01-15 Day trip to Okeechobee area research sites to collect river water for ongoing laboratory experiments.
Bounds
West 27.154541
East -80.875267

Personnel

Organization
600 Fourth Street South
St. Petersburg, FL33701-4846
(727) 502-8000
Principal investigators John T Lisle
Crew members

Data types and categories

Data category: Geochemical
Data type: Experiments (geochemical)

Publications

Samples collected during this field activity