The AIM group will be conducting a reconnaisance visit to the Jones River Landing in Kingston Ma, to determine site suitablilty for a longer term study collecting UAS imagery for photogrammetric reconstructions of the changing stream bed due to dam removal.
Location
Jones River, Kingston MA
Summary
The Jones River Landing site reconnaissance trip on 9/27/2019 was successfully completed. The AIM group investigated the mouth of the Jones River as well as the area at the dam removal site.
Info derived
Site suitability for a longer term monitoring project looking at stream response to dam removal.