Field Activity 2019-037-FA

Identifier 2019-037-FA
Purpose The AIM group will be conducting a reconnaisance visit to the Jones River Landing in Kingston Ma, to determine site suitablilty for a longer term study collecting UAS imagery for photogrammetric reconstructions of the changing stream bed due to dam removal.
Location Jones River, Kingston MA
Summary The Jones River Landing site reconnaissance trip on 9/27/2019 was successfully completed. The AIM group investigated the mouth of the Jones River as well as the area at the dam removal site.
Info derived Site suitability for a longer term monitoring project looking at stream response to dam removal.
Projects
Platform
on foot
survey conducted on foot
Itinerary
Start Woods Hole, MA 2019-09-27
End Woods Hole, MA 2019-09-27
Days in the field 1
Bounds
West -70.74235725
East -70.70653667
North 42.00006363
South 41.98815139

Personnel

Organization
384 Woods Hole Road
Quissett Campus
Woods Hole, MA02543-1598
(508) 548-8700
Principal investigators Erika Lentz
Crew members
Erika Lentz
Scientist, Staff
Seth Ackerman
Scientist, Staff
Elizabeth P Pendleton
Scientist, Staff
Sandra M Brosnahan
Scientist, Staff
Emily J Sturdivant
Scientist, Staff
Information specialist(s)
Sandra M Brosnahan
Specialist, Information

Data types and categories

Data category: Imagery
Data type: Video

Equipment used

Equipment Usage description Data types Datasets
Unmanned Aircraft Systems (UAS) Photo, Video, Navigation (no data reported)

Publications

Samples collected during this field activity