Field Activity 2023-673-FA

Identifier 2023-673-FA
Alternate names Carmel River fieldwork
Purpose Reset survey control in the upper "Control Reach" for continued topographic surveys by collaborators to measure topography and sediment properties of the Carmel River channel, studying watershed response to disturbances including dam removal and large floods.
Location Carmel River, California, USA
Info derived Benchmark locations
Comments Location-Elevation - Profiles: TOTAL STATION Location-Elevation - Benchmarks: TOTAL STATION Entries for this field activity are based on entries from Field Activity 2015-638-FA Entries for this field activity are based on entries from Field Activity 2016-638-FA Entries for this field activity are based on entries from Field Activity 2017-635-FA Entries for this field activity are based on entries from Field Activity 2019-631-FA.
Projects
Platform
on foot
survey conducted on foot
Vehicles
None
Itinerary
Start Carmel, CA 2023-10-06
End Carmel, CA 2023-10-06
Days in the field 1
Bounds
West -121.855
East -121.62661133
North 36.56060076
South 36.37770156

Personnel

Organization
2885 Mission Street
Santa Cruz, CA95060
(831) 460-7401
Principal investigators Amy East
Crew members
Joshua Logan
Scientist, Staff
Information specialist(s)
Joshua Logan
Specialist, Information

Data types and categories

Data category: Location-Elevation
Data type: Navigation, Benchmarks

Equipment used

Equipment Usage description Data types Datasets
Trimble R10 Benchmarks, LIDAR, Navigation, Profiles, Transects (no data reported)
Total Station Benchmarks, Profiles, Transects (no data reported)

Publications

Samples collected during this field activity