2023-03-17 |
2023-03-17 |
M. Itzkin collected three grab samples along Madeira Beach survey transect 60. |
2023-04-21 |
2023-04-21 |
M. Itzkin reset two probes with dying batteries and collected four sediment samples across the beach and dune |
2023-05-26 |
2023-05-26 |
M. Itzkin downloaded data off of the moisture probes and collected sediment samples across the beach at the site of transect 60 |
2023-06-23 |
2023-06-23 |
Collected 4 sediment samples in a transect across the beach for analysis and downloaded data from the moisture probes |
2023-07-07 |
2023-07-07 |
M. Itzkin downloaded the latest moisture probe data for all 5 probes |
2023-08-25 |
2023-08-25 |
Collected sediment samples at 4 cross-shore locations and downloaded latest moisture probe data. Personnel: M. Itzkin |
2023-08-28 |
2023-08-28 |
M. Itzkin and M. Buckley secured equipment on the roof of the Shoreline Island Inn and installed a pressure sensor on the beach ahead of the arrival of Hurricane Idalia. |
2023-08-31 |
2023-08-31 |
M. Buckley and J. Woodruff collected the moisture probe data. M. Palmsten collected sediment samples |