Process_Description:
Logger Deployments: Well data loggers were initially deployed at two sites in September 2015; in subsequent years, additional sites, wells, and sensors were added to the study and this data was previously released in two ScienceBase publications cross referenced in this metadata record (O'Keefe Suttles and others, 2020; O'Keefe Suttles and others, 2022). The present data release includes well data logged between 8/12/2021 and November 2024. Data loggers were periodically downloaded in the field using instrument manufacturers' software (WinSitu for CTDs and HOBOPro for temperature loggers); data were inspected for general accuracy. In May 2022 a new well at the Herring River Phragmites (HRP) site was installed closer to the eddy co-variance flux tower deployment. CTD data from the previous HRP well ends 5/18/2022 and data from the new well begins 5/25/2022; soil and air temperature data is reported from both sites from 5/18/2022 - 12/30/22 and then only from the new site until 9/1/2023.
Soil or air temperature sensors were co-deployed at some sites as needed for specific research purposes. Soil temperature sensors were attached to a wooden stick and pushed by hand so that the bottom of the temperature sensor was 10 cm below the land surface; at one site, HRTLP-Creek, we also installed a soil temperature sensor 100cm below the land surface. The air temperature sensor was inserted into a draft shield and attached to the groundwater well about 1 meter above the land surface. Site specific temperature sensor manufacturer make, model, serial numbers, and dates of deployment are as follows:
HRTLP-Upland Onset HOBO MX2303 serial number 21079739; 5/12/2022-12/12/2022 (logged: temp_air and soil temp_10cm).
HRTLP-Creek Onset HOBO MX2303 serial number 21058593; 5/12/2022-12/12/2022 (logged: soil temp_10cm and soil temp_100cm).
HRDHA Onset HOBO U23-003 serial number 10897046; 4/27/2023-3/22/2024 (logged soil temp_10cm).
HRDHB Onset HOBO U23-003 serial number 10897045; 4/27/2023-12/13/2023 (logged: temp_air and soil temp_10cm).
HRDHC Onset HOBO U23-003 serial number 10897053; 4/27/2023-12/09/2023 (logged soil temp_10cm).
HRP (41.9377049, -70.0546965) Onset HOBO U23-003 serial number 10897045; 5/18/2022-12/30/2022 (logged: temp_air and soil temp_10cm).
HRP (41.9378776, -70.0549772) Onset HOBO MX2303 serial number 21058594; 5/18/2022-9/1/2023 (logged: temp_air and soil temp_10cm).
Dates of site visits are listed as follows:
HR Bound Brook: 8/12/2021, 9/17/2021, 10/14/2021, 5/17/2022, 8/16/2022, 12/12/2022, 5/25/2023, 10/19/2023, 5/14/2024, 12/3/2024.
HR Duck Harbor Forest: 8/12/2021, 9/17/2021, 10/14/2021, 5/26/2022, 12/12/2022, 2/17/2023.
HR Duck Harbor Wetland: 8/12/2021, 9/17/2021, 10/14/2021, 5/26/2022, 5/26/2022, 8/25/2022, 1/27/2023, 4/27/2023.
HR Duck Harbor A: 4/27/2023, 5/25/2023, 6/12/2023, 7/25/2023, 9/27/2023, 12/12/2023, 3/22/2024, 4/23/2024, 11/27/2024.
HR Duck Harbor B: 4/27/2023, 5/25/2023, 6/12/2023, 7/25/2023, 8/16/2023, 9/27/2023, 12/12/2023, 3/22/2024, 4/23/2024, 11/27/2024.
HR Duck Harbor C: 4/27/2023, 5/25/2023, 6/12/2023, 7/25/2023, 9/27/2023, 12/12/2023, 3/22/2024, 4/23/2024, 11/27/2024.
HR Hopkins Wet Shrub: 11/02/2021, 5/19/2021, 6/15/2022, 8/8/2022, 12/12/2022, 5/25/2023, 10/19/2023, 4/23/2024, 12/3/2024.
HR Upper Pole Dike: 10/1/2021, 10/14/2021, 12/7/2021, 5/23/2022, 8/8/2022, 8/16/2022, 12/12/2022, 6/12/2023, 10/19/2023, 4/23/2024, 12/3/2024.
HR Phragmites: 11/17/2021, 5/18/2022, 5/25/2022, 7/14/2022, 12/12/2022, 3/16/2023, 5/25/2023, 9/19/2023, 10/19/2023, 5/14/2024, 12/3/2024.
HR High Toss Dry Forest: 11/02/2021, 5/19/2021, 6/15/2022, 8/8/2022, 12/12/2022, 5/25/2023, 10/19/2023, 4/23/2024, 12/3/2024.
HR Old County Typha: 9/17/2021, 11/2/2021, 11/17/2021, 5/12/2022, 5/18/2022, 6/28/22, 7/14/22, 8/8/22, 8/16/22, 12/12/2022, 3/16/2023, 5/25/2023, 7/25/2023, 9/19/2023, 11/16/2023, 3/22/2024, 5/14/2024, 11/27/2024.
HRTLP-Creek_33cm: 5/12/2022, 6/21/2022, 6/28/2022, 8/16/2022, 10/21/2022, 9/11/2023, 11/16/2023, 4/23/2024.
HRTLP-Creek_174cm: 5/12/2022, 6/21/2022, 6/28/2022, 8/16/2022, 10/21/2022, 9/11/2023, 11/16/2023, 4/23/2024.
HRTLP-River: 5/23/2022, 7/25/2022, 10/21/2022.
HRTLP-Upland_38cm: 5/12/2022, 6/21/2022, 6/28/2022, 8/16/2022, 10/21/2022.
HRTLP-Upland_114cm: 6/21/2022, 6/28/2022, 8/16/2022, 10/21/2022.
HRTLP-Upland_110cm: 8/29/2022, 10/21/2022.
HRTLP-Marsh: 9/11/2023, 11/16/2023.
The process date represents the most recent end date for this process step.
Process_Date: 2024