Magirl, Christopher S.

About the author


Daily sediment loads during and after dam removal in the Elwha River, Washington, 2011 to 2016

Daily values of discharge and sediment loads were measured and estimated at U.S. Geological Survey gaging station 12046260, on the Elwha River at the diversion near Port Angeles, Washington. Daily data are reported from September 15, 2011 to September 30, 2016. Specific data include (1) date; (2) discharge; (3) suspended-sediment concentration and one standard-deviation bounds; (4) percentage of fine-grained particles (silts and clays) in suspension; (5) loads of total suspended-sediment, fine-grained ...

Info
Suspended sediment concentration data in the Elwha River, Washington, September 2011 to September 2016

This data release provides 15-minute data of suspended-sediment concentration and fine (less than 0.0625 mm) suspended-sediment concentration during the removal of 2 large dams on the Elwha River from September 2011 to September 2016. Data are derived from regression relations with turbidity at the USGS gaging station Elwha River at the Diversion (no.12046260).

Info
Upstream sediment contributions to Lake Mills on the Elwha River, Washington, 1926 to 2016

Sediment inputs to Lake Mills, on the Elwha River, Washington, were measured from 1927 to 2016. These measurements represent the annual total sediment load, in tonnes per year, that were input into Lake Mills and partially trapped by Glines Canyon dam. The sediment was allowed to erode and be transported down-river by the removal of the Glines Canyon and Elwha dams during 2011 to 2014. The measurements were taken as part of a study investigating the river channel's morphological responses to the removal of ...

Info
Digital elevation models (DEMs) of the lower Elwha River, Washington, water year 2013 to 2016

Digital elevation models (DEMs) of the lower Elwha River, Washington, were created by synthesizing lidar and PlaneCam Structure-from-Motion (SfM) data. Lidar and still digital photographs were collected by airplane during surveys from 2012 to 2016. The digital photographs were used to create a SfM digital surface model. Each DEM represents the ending conditions for that water year (for example, the 2013 DEM represents conditions at approximately September 30, 2013). The final DEMs, presented here, were ...

Info
Orthomosaic images of the middle and lower Elwha River, Washington, 2012 to 2017

This dataset presents 28 georeferenced orthomosaic images of the middle and lower reaches of the Elwha River. Each mosaic image was created by stitching together thousands of individual photographs that were matched based on numerous unique tie points shared by the photographs. The individual photographs were taken by a plane-mounted camera during multiple flights over the study area spanning 2012 to 2017. Because each mosaic is orthogonal to the earth's surface and is georeferenced to real-world ...

Info
Monthly bedload estimates, Elwha River, Washington, October 2015 to September 2016

Bedload sediment transport was calculated on the Elwha River, Washington to measure the amount of sediment transported along the riverbed during the 2016 water year. Bedload was measured using the Elwha bedload impact plate system (Hilldale and others, 2015). Physical bedload sampling by the U.S. Bureau of Reclamation for system calibration took place during November, 2012; March, May, and June 2013; and April 2014 at the Diversion Weir gauge (Magirl and others, 2015). Early in water year 2016 (year 5) the ...

Info
Elevations of the Elwha and Mills dams, Elwha River, Washington, 2008 to 2013

This dataset presents elevation measurements of two dams on the Elwha River, Washington, during their removal processes from 2008 to 2013. Elevation measurements of the Elwha Dam were taken from October 2008 to March 2012. Elevation measurements of the Glines Canyon dam, which was further upstream than the Elwha Dam, were taken from October 2010 to October 2013. The measurements were by the U.S. Bureau of Reclamation as part of a study investigating the river channel's morphological responses to dam removal ...

Info
Streamgage measurements, Elwha River, Washington, 2011 to 2016

Streamgage levels on the Elwha River were measured from 2011 to 2016. These measurements show the height of the river's water surface, both in meters relative to the stream bed, as well as in meters relative to vertical geographic coordinates. Measurements were collected using a Global Water WL16 battery-operated vented water level logger in a hardened casing. The instrument was installed on October 17, 2011 on the left bank of the Elwha River at a power line crossing above the Elwha Surface Water Intake ...

Info